Ecoer Logo
VOTING POWER100.00%
DOWNVOTE POWER100.00%
RESOURCE CREDITS100.00%
REPUTATION PROGRESS0.00%
Net Worth
0.037USD
STEEM
0.000STEEM
SBD
0.000SBD
Effective Power
5.008SP
├── Own SP
0.632SP
└── Incoming Deleg
+4.376SP

Detailed Balance

STEEM
balance
0.000STEEM
market_balance
0.000STEEM
savings_balance
0.000STEEM
reward_steem_balance
0.000STEEM
STEEM POWER
Own SP
0.632SP
Delegated Out
0.000SP
Delegation In
4.376SP
Effective Power
5.008SP
Reward SP (pending)
0.000SP
SBD
sbd_balance
0.000SBD
sbd_conversions
0.000SBD
sbd_market_balance
0.000SBD
savings_sbd_balance
0.000SBD
reward_sbd_balance
0.000SBD
{
  "balance": "0.000 STEEM",
  "savings_balance": "0.000 STEEM",
  "reward_steem_balance": "0.000 STEEM",
  "vesting_shares": "1027.130418 VESTS",
  "delegated_vesting_shares": "0.000000 VESTS",
  "received_vesting_shares": "7116.529388 VESTS",
  "sbd_balance": "0.000 SBD",
  "savings_sbd_balance": "0.000 SBD",
  "reward_sbd_balance": "0.000 SBD",
  "conversions": []
}

Account Info

namecgrffs
id444839
rank823,301
reputation76033135
created2017-11-12T22:43:57
recovery_accountsteem
proxyNone
post_count4
comment_count0
lifetime_vote_count0
witnesses_voted_for0
last_post2017-11-17T23:52:00
last_root_post2017-11-17T23:52:00
last_vote_time2017-11-17T23:56:09
proxied_vsf_votes0, 0, 0, 0
can_vote1
voting_power0
delayed_votes0
balance0.000 STEEM
savings_balance0.000 STEEM
sbd_balance0.000 SBD
savings_sbd_balance0.000 SBD
vesting_shares1027.130418 VESTS
delegated_vesting_shares0.000000 VESTS
received_vesting_shares7116.529388 VESTS
reward_vesting_balance0.000000 VESTS
vesting_balance0.000 STEEM
vesting_withdraw_rate0.000000 VESTS
next_vesting_withdrawal1969-12-31T23:59:59
withdrawn0
to_withdraw0
withdraw_routes0
savings_withdraw_requests0
last_account_recovery1970-01-01T00:00:00
reset_accountnull
last_owner_update1970-01-01T00:00:00
last_account_update1970-01-01T00:00:00
minedNo
sbd_seconds0
sbd_last_interest_payment1970-01-01T00:00:00
savings_sbd_last_interest_payment1970-01-01T00:00:00
{
  "id": 444839,
  "name": "cgrffs",
  "owner": {
    "weight_threshold": 1,
    "account_auths": [],
    "key_auths": [
      [
        "STM5HDzmK1h9CZicqDZT9Jr2V7KBruKAPttg2TwkNJbnKtJvyLQcR",
        1
      ]
    ]
  },
  "active": {
    "weight_threshold": 1,
    "account_auths": [],
    "key_auths": [
      [
        "STM66V72BGRU78TwTteupDjDfkRs9gHt9D4vFuR5LWej1MiiCBoMp",
        1
      ]
    ]
  },
  "posting": {
    "weight_threshold": 1,
    "account_auths": [],
    "key_auths": [
      [
        "STM6LMW2feM8Ka2itNbrARGrTjaaE9HH9NmJzPQE94binakSccyZ6",
        1
      ]
    ]
  },
  "memo_key": "STM5bEzxwAYKPdPvfXqgrX6VUeyov69CyH1NAsZKQzAmyrFLvjQsN",
  "json_metadata": "",
  "posting_json_metadata": "",
  "proxy": "",
  "last_owner_update": "1970-01-01T00:00:00",
  "last_account_update": "1970-01-01T00:00:00",
  "created": "2017-11-12T22:43:57",
  "mined": false,
  "recovery_account": "steem",
  "last_account_recovery": "1970-01-01T00:00:00",
  "reset_account": "null",
  "comment_count": 0,
  "lifetime_vote_count": 0,
  "post_count": 4,
  "can_vote": true,
  "voting_manabar": {
    "current_mana": "8143659806",
    "last_update_time": 1779057288
  },
  "downvote_manabar": {
    "current_mana": 2035914951,
    "last_update_time": 1779057288
  },
  "voting_power": 0,
  "balance": "0.000 STEEM",
  "savings_balance": "0.000 STEEM",
  "sbd_balance": "0.000 SBD",
  "sbd_seconds": "0",
  "sbd_seconds_last_update": "1970-01-01T00:00:00",
  "sbd_last_interest_payment": "1970-01-01T00:00:00",
  "savings_sbd_balance": "0.000 SBD",
  "savings_sbd_seconds": "0",
  "savings_sbd_seconds_last_update": "1970-01-01T00:00:00",
  "savings_sbd_last_interest_payment": "1970-01-01T00:00:00",
  "savings_withdraw_requests": 0,
  "reward_sbd_balance": "0.000 SBD",
  "reward_steem_balance": "0.000 STEEM",
  "reward_vesting_balance": "0.000000 VESTS",
  "reward_vesting_steem": "0.000 STEEM",
  "vesting_shares": "1027.130418 VESTS",
  "delegated_vesting_shares": "0.000000 VESTS",
  "received_vesting_shares": "7116.529388 VESTS",
  "vesting_withdraw_rate": "0.000000 VESTS",
  "next_vesting_withdrawal": "1969-12-31T23:59:59",
  "withdrawn": 0,
  "to_withdraw": 0,
  "withdraw_routes": 0,
  "curation_rewards": 0,
  "posting_rewards": 0,
  "proxied_vsf_votes": [
    0,
    0,
    0,
    0
  ],
  "witnesses_voted_for": 0,
  "last_post": "2017-11-17T23:52:00",
  "last_root_post": "2017-11-17T23:52:00",
  "last_vote_time": "2017-11-17T23:56:09",
  "post_bandwidth": 0,
  "pending_claimed_accounts": 0,
  "vesting_balance": "0.000 STEEM",
  "reputation": 76033135,
  "transfer_history": [],
  "market_history": [],
  "post_history": [],
  "vote_history": [],
  "other_history": [],
  "witness_votes": [],
  "tags_usage": [],
  "guest_bloggers": [],
  "rank": 823301
}

Withdraw Routes

IncomingOutgoing
Empty
Empty
{
  "incoming": [],
  "outgoing": []
}
From Date
To Date
steemdelegated 4.376 SP to @cgrffs
2026/05/17 22:34:48
delegatorsteem
delegateecgrffs
vesting shares7116.529388 VESTS
Transaction InfoBlock #106141449/Trx bea563953b0c765d76f6768e972177eae7fb62cd
View Raw JSON Data
{
  "trx_id": "bea563953b0c765d76f6768e972177eae7fb62cd",
  "block": 106141449,
  "trx_in_block": 3,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2026-05-17T22:34:48",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "7116.529388 VESTS"
    }
  ]
}
steemdelegated 2.708 SP to @cgrffs
2026/05/11 21:11:12
delegatorsteem
delegateecgrffs
vesting shares4404.318983 VESTS
Transaction InfoBlock #105967745/Trx cbf040c865ba13e4c4f9f2632a49f380695ebccc
View Raw JSON Data
{
  "trx_id": "cbf040c865ba13e4c4f9f2632a49f380695ebccc",
  "block": 105967745,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2026-05-11T21:11:12",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "4404.318983 VESTS"
    }
  ]
}
steemdelegated 4.384 SP to @cgrffs
2026/04/25 21:58:21
delegatorsteem
delegateecgrffs
vesting shares7129.045144 VESTS
Transaction InfoBlock #105509148/Trx 0098e69bd0a2211c65252792e64ee6270a052256
View Raw JSON Data
{
  "trx_id": "0098e69bd0a2211c65252792e64ee6270a052256",
  "block": 105509148,
  "trx_in_block": 1,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2026-04-25T21:58:21",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "7129.045144 VESTS"
    }
  ]
}
steemdelegated 2.734 SP to @cgrffs
2026/01/23 03:23:39
delegatorsteem
delegateecgrffs
vesting shares4445.865802 VESTS
Transaction InfoBlock #102846536/Trx 444ce014b735f622c9965559e253ae4e71715477
View Raw JSON Data
{
  "trx_id": "444ce014b735f622c9965559e253ae4e71715477",
  "block": 102846536,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2026-01-23T03:23:39",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "4445.865802 VESTS"
    }
  ]
}
steemdelegated 2.835 SP to @cgrffs
2024/12/16 22:42:54
delegatorsteem
delegateecgrffs
vesting shares4610.084999 VESTS
Transaction InfoBlock #91292940/Trx 55e41da741c9475adc8779ed7a1d90864b345d58
View Raw JSON Data
{
  "trx_id": "55e41da741c9475adc8779ed7a1d90864b345d58",
  "block": 91292940,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2024-12-16T22:42:54",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "4610.084999 VESTS"
    }
  ]
}
steemdelegated 2.939 SP to @cgrffs
2023/11/13 14:27:51
delegatorsteem
delegateecgrffs
vesting shares4779.218531 VESTS
Transaction InfoBlock #79847200/Trx 1b3982fa4450c921d35ee696e0048c3cc00e654e
View Raw JSON Data
{
  "trx_id": "1b3982fa4450c921d35ee696e0048c3cc00e654e",
  "block": 79847200,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2023-11-13T14:27:51",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "4779.218531 VESTS"
    }
  ]
}
steemdelegated 4.745 SP to @cgrffs
2023/09/21 19:53:12
delegatorsteem
delegateecgrffs
vesting shares7716.497317 VESTS
Transaction InfoBlock #78345509/Trx dd7c9292c929b179326b3efe898122dde25b6eae
View Raw JSON Data
{
  "trx_id": "dd7c9292c929b179326b3efe898122dde25b6eae",
  "block": 78345509,
  "trx_in_block": 1,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2023-09-21T19:53:12",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "7716.497317 VESTS"
    }
  ]
}
steemdelegated 4.881 SP to @cgrffs
2022/11/03 09:54:09
delegatorsteem
delegateecgrffs
vesting shares7938.178755 VESTS
Transaction InfoBlock #69111110/Trx 9c9aa444470e8631038f02b530c7d691b38890a8
View Raw JSON Data
{
  "trx_id": "9c9aa444470e8631038f02b530c7d691b38890a8",
  "block": 69111110,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2022-11-03T09:54:09",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "7938.178755 VESTS"
    }
  ]
}
steemdelegated 5.017 SP to @cgrffs
2022/01/17 09:18:48
delegatorsteem
delegateecgrffs
vesting shares8158.711986 VESTS
Transaction InfoBlock #60807454/Trx b2dbebda0fca8637b77c579f66a2ecddf24f5ddb
View Raw JSON Data
{
  "trx_id": "b2dbebda0fca8637b77c579f66a2ecddf24f5ddb",
  "block": 60807454,
  "trx_in_block": 18,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2022-01-17T09:18:48",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8158.711986 VESTS"
    }
  ]
}
steemdelegated 5.130 SP to @cgrffs
2021/06/13 23:17:54
delegatorsteem
delegateecgrffs
vesting shares8342.480644 VESTS
Transaction InfoBlock #54605921/Trx 6f6a1c63f177001b9b2038ed33644a52a8a91c45
View Raw JSON Data
{
  "trx_id": "6f6a1c63f177001b9b2038ed33644a52a8a91c45",
  "block": 54605921,
  "trx_in_block": 3,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2021-06-13T23:17:54",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8342.480644 VESTS"
    }
  ]
}
steemdelegated 5.245 SP to @cgrffs
2020/12/11 09:38:54
delegatorsteem
delegateecgrffs
vesting shares8529.902618 VESTS
Transaction InfoBlock #49353439/Trx bac2cd82e58c2b568e4c06605d660e151a16f46c
View Raw JSON Data
{
  "trx_id": "bac2cd82e58c2b568e4c06605d660e151a16f46c",
  "block": 49353439,
  "trx_in_block": 5,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-12-11T09:38:54",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8529.902618 VESTS"
    }
  ]
}
steemdelegated 1.176 SP to @cgrffs
2020/12/06 03:16:21
delegatorsteem
delegateecgrffs
vesting shares1912.543513 VESTS
Transaction InfoBlock #49205009/Trx 2bbfb2e605d46b0b44d0ec9c9283e845d23c22c8
View Raw JSON Data
{
  "trx_id": "2bbfb2e605d46b0b44d0ec9c9283e845d23c22c8",
  "block": 49205009,
  "trx_in_block": 1,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-12-06T03:16:21",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "1912.543513 VESTS"
    }
  ]
}
steemdelegated 5.249 SP to @cgrffs
2020/12/05 11:13:21
delegatorsteem
delegateecgrffs
vesting shares8536.269257 VESTS
Transaction InfoBlock #49186116/Trx d8cad1945ffd4b853c453d7c3ce50cb5089cd1ee
View Raw JSON Data
{
  "trx_id": "d8cad1945ffd4b853c453d7c3ce50cb5089cd1ee",
  "block": 49186116,
  "trx_in_block": 5,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-12-05T11:13:21",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8536.269257 VESTS"
    }
  ]
}
steemdelegated 1.181 SP to @cgrffs
2020/11/02 12:24:03
delegatorsteem
delegateecgrffs
vesting shares1920.017158 VESTS
Transaction InfoBlock #48253993/Trx b3c4ae17fac605ceb6e17044084a32abd1659bb7
View Raw JSON Data
{
  "trx_id": "b3c4ae17fac605ceb6e17044084a32abd1659bb7",
  "block": 48253993,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-11-02T12:24:03",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "1920.017158 VESTS"
    }
  ]
}
steemdelegated 5.374 SP to @cgrffs
2020/05/09 04:11:57
delegatorsteem
delegateecgrffs
vesting shares8738.915831 VESTS
Transaction InfoBlock #43215232/Trx 043f5112c2fcf08674a994e6398e9bdb9543fd4a
View Raw JSON Data
{
  "trx_id": "043f5112c2fcf08674a994e6398e9bdb9543fd4a",
  "block": 43215232,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-05-09T04:11:57",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8738.915831 VESTS"
    }
  ]
}
steemdelegated 1.201 SP to @cgrffs
2020/05/08 07:34:45
delegatorsteem
delegateecgrffs
vesting shares1953.311140 VESTS
Transaction InfoBlock #43191066/Trx 5e58e3b8b223afc5b65373036e49e3eb7e598b91
View Raw JSON Data
{
  "trx_id": "5e58e3b8b223afc5b65373036e49e3eb7e598b91",
  "block": 43191066,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-05-08T07:34:45",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "1953.311140 VESTS"
    }
  ]
}
steemdelegated 5.382 SP to @cgrffs
2020/04/15 20:38:33
delegatorsteem
delegateecgrffs
vesting shares8751.893250 VESTS
Transaction InfoBlock #42561429/Trx 5971be17cd7542cfab35c09fcadf28595974542e
View Raw JSON Data
{
  "trx_id": "5971be17cd7542cfab35c09fcadf28595974542e",
  "block": 42561429,
  "trx_in_block": 21,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2020-04-15T20:38:33",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8751.893250 VESTS"
    }
  ]
}
2019/11/13 00:16:36
parent authorcgrffs
parent permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
authorsteemitboard
permlinksteemitboard-notify-cgrffs-20191113t001635000z
title
bodyCongratulations @cgrffs! You received a personal award! <table><tr><td>https://steemitimages.com/70x70/http://steemitboard.com/@cgrffs/birthday2.png</td><td>Happy Birthday! - You are on the Steem blockchain for 2 years!</td></tr></table> <sub>_You can view [your badges on your Steem Board](https://steemitboard.com/@cgrffs) and compare to others on the [Steem Ranking](https://steemitboard.com/ranking/index.php?name=cgrffs)_</sub> **Do not miss the last post from @steemitboard:** <table><tr><td><a href="https://steemit.com/steemfest/@steemitboard/steemfest-meet-the-stemians-contest-the-mysterious-rule-revealed"><img src="https://steemitimages.com/64x128/https://cdn.steemitimages.com/DQmasWw4jQHwxng82DKxY6Q6tVg9mWcto4xcDURs8knFgCa/image.png"></a></td><td><a href="https://steemit.com/steemfest/@steemitboard/steemfest-meet-the-stemians-contest-the-mysterious-rule-revealed">SteemFest Meet The Stemians Contest - The mysterious rule revealed</a></td></tr></table> ###### [Vote for @Steemitboard as a witness](https://v2.steemconnect.com/sign/account-witness-vote?witness=steemitboard&approve=1) to get one more award and increased upvotes!
json metadata{"image":["https://steemitboard.com/img/notify.png"]}
Transaction InfoBlock #38124086/Trx 1c5c942d5814edd6f4962004707c536a2ceba159
View Raw JSON Data
{
  "trx_id": "1c5c942d5814edd6f4962004707c536a2ceba159",
  "block": 38124086,
  "trx_in_block": 9,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2019-11-13T00:16:36",
  "op": [
    "comment",
    {
      "parent_author": "cgrffs",
      "parent_permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "author": "steemitboard",
      "permlink": "steemitboard-notify-cgrffs-20191113t001635000z",
      "title": "",
      "body": "Congratulations @cgrffs! You received a personal award!\n\n<table><tr><td>https://steemitimages.com/70x70/http://steemitboard.com/@cgrffs/birthday2.png</td><td>Happy Birthday! - You are on the Steem blockchain for 2 years!</td></tr></table>\n\n<sub>_You can view [your badges on your Steem Board](https://steemitboard.com/@cgrffs) and compare to others on the [Steem Ranking](https://steemitboard.com/ranking/index.php?name=cgrffs)_</sub>\n\n\n**Do not miss the last post from @steemitboard:**\n<table><tr><td><a href=\"https://steemit.com/steemfest/@steemitboard/steemfest-meet-the-stemians-contest-the-mysterious-rule-revealed\"><img src=\"https://steemitimages.com/64x128/https://cdn.steemitimages.com/DQmasWw4jQHwxng82DKxY6Q6tVg9mWcto4xcDURs8knFgCa/image.png\"></a></td><td><a href=\"https://steemit.com/steemfest/@steemitboard/steemfest-meet-the-stemians-contest-the-mysterious-rule-revealed\">SteemFest Meet The Stemians Contest - The mysterious rule revealed</a></td></tr></table>\n\n###### [Vote for @Steemitboard as a witness](https://v2.steemconnect.com/sign/account-witness-vote?witness=steemitboard&approve=1) to get one more award and increased upvotes!",
      "json_metadata": "{\"image\":[\"https://steemitboard.com/img/notify.png\"]}"
    }
  ]
}
steemdelegated 5.502 SP to @cgrffs
2019/05/12 13:53:09
delegatorsteem
delegateecgrffs
vesting shares8947.516055 VESTS
Transaction InfoBlock #32844266/Trx 24e6b94c67fac6147bb4fa5c205705b8cf023ec4
View Raw JSON Data
{
  "trx_id": "24e6b94c67fac6147bb4fa5c205705b8cf023ec4",
  "block": 32844266,
  "trx_in_block": 69,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2019-05-12T13:53:09",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "8947.516055 VESTS"
    }
  ]
}
2018/11/12 23:42:57
parent authorcgrffs
parent permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
authorsteemitboard
permlinksteemitboard-notify-cgrffs-20181112t234257000z
title
bodyCongratulations @cgrffs! You have received a personal award! [![](https://steemitimages.com/70x70/http://steemitboard.com/@cgrffs/birthday1.png)](http://steemitboard.com/@cgrffs) 1 Year on Steemit <sub>_Click on the badge to view your Board of Honor._</sub> **Do not miss the last post from @steemitboard:** <table><tr><td><a href="https://steemit.com/steemfest/@steemitboard/steemfest3-and-steemitboard-meet-the-steemians-contest"><img src="https://steemitimages.com/64x128/https://cdn.steemitimages.com/DQmeLukvNFRsa7RURqsFpiLGEZZD49MiU52JtWmjS5S2wtW/image.png"></a></td><td><a href="https://steemit.com/steemfest/@steemitboard/steemfest3-and-steemitboard-meet-the-steemians-contest">SteemFest3 and SteemitBoard - Meet the Steemians Contest</a></td></tr></table> > Support [SteemitBoard's project](https://steemit.com/@steemitboard)! **[Vote for its witness](https://v2.steemconnect.com/sign/account-witness-vote?witness=steemitboard&approve=1)** and **get one more award**!
json metadata{"image":["https://steemitboard.com/img/notify.png"]}
Transaction InfoBlock #27648431/Trx a5ca2e4f054c21e1e3e46545d3c3d591fadfae33
View Raw JSON Data
{
  "trx_id": "a5ca2e4f054c21e1e3e46545d3c3d591fadfae33",
  "block": 27648431,
  "trx_in_block": 13,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2018-11-12T23:42:57",
  "op": [
    "comment",
    {
      "parent_author": "cgrffs",
      "parent_permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "author": "steemitboard",
      "permlink": "steemitboard-notify-cgrffs-20181112t234257000z",
      "title": "",
      "body": "Congratulations @cgrffs! You have received a personal award!\n\n[![](https://steemitimages.com/70x70/http://steemitboard.com/@cgrffs/birthday1.png)](http://steemitboard.com/@cgrffs)  1 Year on Steemit\n<sub>_Click on the badge to view your Board of Honor._</sub>\n\n\n**Do not miss the last post from @steemitboard:**\n<table><tr><td><a href=\"https://steemit.com/steemfest/@steemitboard/steemfest3-and-steemitboard-meet-the-steemians-contest\"><img src=\"https://steemitimages.com/64x128/https://cdn.steemitimages.com/DQmeLukvNFRsa7RURqsFpiLGEZZD49MiU52JtWmjS5S2wtW/image.png\"></a></td><td><a href=\"https://steemit.com/steemfest/@steemitboard/steemfest3-and-steemitboard-meet-the-steemians-contest\">SteemFest3 and SteemitBoard - Meet the Steemians Contest</a></td></tr></table>\n\n> Support [SteemitBoard's project](https://steemit.com/@steemitboard)! **[Vote for its witness](https://v2.steemconnect.com/sign/account-witness-vote?witness=steemitboard&approve=1)** and **get one more award**!",
      "json_metadata": "{\"image\":[\"https://steemitboard.com/img/notify.png\"]}"
    }
  ]
}
steemdelegated 5.625 SP to @cgrffs
2018/05/16 20:10:21
delegatorsteem
delegateecgrffs
vesting shares9147.068490 VESTS
Transaction InfoBlock #22489708/Trx 8ee732f946bb0098fbb3edca58327ff66f33a639
View Raw JSON Data
{
  "trx_id": "8ee732f946bb0098fbb3edca58327ff66f33a639",
  "block": 22489708,
  "trx_in_block": 33,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2018-05-16T20:10:21",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "9147.068490 VESTS"
    }
  ]
}
steemdelegated 18.161 SP to @cgrffs
2018/04/21 20:40:12
delegatorsteem
delegateecgrffs
vesting shares29535.037530 VESTS
Transaction InfoBlock #21771092/Trx 60524c50a0bf4e06a6274792adeec468ccfffe8d
View Raw JSON Data
{
  "trx_id": "60524c50a0bf4e06a6274792adeec468ccfffe8d",
  "block": 21771092,
  "trx_in_block": 41,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2018-04-21T20:40:12",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "29535.037530 VESTS"
    }
  ]
}
steemdelegated 18.287 SP to @cgrffs
2017/12/12 22:21:36
delegatorsteem
delegateecgrffs
vesting shares29738.869582 VESTS
Transaction InfoBlock #18032615/Trx e6696af223e0602acb862bc56faebaa670260da1
View Raw JSON Data
{
  "trx_id": "e6696af223e0602acb862bc56faebaa670260da1",
  "block": 18032615,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-12-12T22:21:36",
  "op": [
    "delegate_vesting_shares",
    {
      "delegator": "steem",
      "delegatee": "cgrffs",
      "vesting_shares": "29738.869582 VESTS"
    }
  ]
}
2017/12/04 10:37:48
votermindsportsio
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
weight100 (1.00%)
Transaction InfoBlock #17788289/Trx 8497976a31190b74adf1e8e9933c59090fa73a7a
View Raw JSON Data
{
  "trx_id": "8497976a31190b74adf1e8e9933c59090fa73a7a",
  "block": 17788289,
  "trx_in_block": 14,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-12-04T10:37:48",
  "op": [
    "vote",
    {
      "voter": "mindsportsio",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "weight": 100
    }
  ]
}
2017/12/04 10:21:12
votermindsportsio
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
weight100 (1.00%)
Transaction InfoBlock #17787957/Trx 2a645127f3545c0e1c3ead95b666de427266e4a3
View Raw JSON Data
{
  "trx_id": "2a645127f3545c0e1c3ead95b666de427266e4a3",
  "block": 17787957,
  "trx_in_block": 11,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-12-04T10:21:12",
  "op": [
    "vote",
    {
      "voter": "mindsportsio",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "weight": 100
    }
  ]
}
cgrffsfollowed @aarony
2017/11/19 13:54:48
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"aarony","what":["blog"]}]
Transaction InfoBlock #17360401/Trx 2370fb62b4831bea0b597d6713979ed8dd458d6e
View Raw JSON Data
{
  "trx_id": "2370fb62b4831bea0b597d6713979ed8dd458d6e",
  "block": 17360401,
  "trx_in_block": 14,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-19T13:54:48",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"aarony\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/18 23:26:54
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"sanchezpuukko","what":["blog"]}]
Transaction InfoBlock #17343057/Trx a97fee5bd65511b2a9c826c939220ce9edafe43a
View Raw JSON Data
{
  "trx_id": "a97fee5bd65511b2a9c826c939220ce9edafe43a",
  "block": 17343057,
  "trx_in_block": 12,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T23:26:54",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"sanchezpuukko\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/18 13:28:42
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"mizanur6452687","what":["blog"]}]
Transaction InfoBlock #17331095/Trx 618dace3ff05f19bb0d85cadd9d48c08ef1df952
View Raw JSON Data
{
  "trx_id": "618dace3ff05f19bb0d85cadd9d48c08ef1df952",
  "block": 17331095,
  "trx_in_block": 11,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T13:28:42",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"mizanur6452687\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/18 10:24:45
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"mr-android-guru","what":["blog"]}]
Transaction InfoBlock #17327416/Trx 84893cfb57c41b55f7c2b63bfff6a0227d41e99a
View Raw JSON Data
{
  "trx_id": "84893cfb57c41b55f7c2b63bfff6a0227d41e99a",
  "block": 17327416,
  "trx_in_block": 26,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T10:24:45",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"mr-android-guru\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/18 00:45:03
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"kingscrown","what":[]}]
Transaction InfoBlock #17315822/Trx 04d641e63fa4142f7aa81ccc71816c3772ad9cd9
View Raw JSON Data
{
  "trx_id": "04d641e63fa4142f7aa81ccc71816c3772ad9cd9",
  "block": 17315822,
  "trx_in_block": 18,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:45:03",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"kingscrown\",\"what\":[]}]"
    }
  ]
}
2017/11/18 00:19:48
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology","bitcoin","news"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315317/Trx c0ca26fc15d11b152f6ae1fc8280a14208eed27c
View Raw JSON Data
{
  "trx_id": "c0ca26fc15d11b152f6ae1fc8280a14208eed27c",
  "block": 17315317,
  "trx_in_block": 4,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:19:48",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\",\"bitcoin\",\"news\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:16:57
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315260/Trx 62cc6f06563873f221ba247b41a820e715414d8d
View Raw JSON Data
{
  "trx_id": "62cc6f06563873f221ba247b41a820e715414d8d",
  "block": 17315260,
  "trx_in_block": 30,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:16:57",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:16:18
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315247/Trx 47a2cdc7f8d3fe9fe6549b173f95b814c347ac83
View Raw JSON Data
{
  "trx_id": "47a2cdc7f8d3fe9fe6549b173f95b814c347ac83",
  "block": 17315247,
  "trx_in_block": 20,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:16:18",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:15:39
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315234/Trx c09cc41a3b1344cf90ff0c35d8b8db05acbc59b0
View Raw JSON Data
{
  "trx_id": "c09cc41a3b1344cf90ff0c35d8b8db05acbc59b0",
  "block": 17315234,
  "trx_in_block": 8,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:15:39",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:15:24
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315229/Trx 7c5b098a05453ac7b35fe0302055323a93460d9f
View Raw JSON Data
{
  "trx_id": "7c5b098a05453ac7b35fe0302055323a93460d9f",
  "block": 17315229,
  "trx_in_block": 11,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:15:24",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:15:06
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology","bitcoin"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315223/Trx 819f6232d7a86ea07b45f175ffa00185f9476a8e
View Raw JSON Data
{
  "trx_id": "819f6232d7a86ea07b45f175ffa00185f9476a8e",
  "block": 17315223,
  "trx_in_block": 10,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:15:06",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\",\"bitcoin\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:14:42
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology","bitcoin"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315215/Trx ac7b7f3a992214f97ae8ea06833917c418b72f90
View Raw JSON Data
{
  "trx_id": "ac7b7f3a992214f97ae8ea06833917c418b72f90",
  "block": 17315215,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:14:42",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\",\"bitcoin\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:14:33
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology","bitcoin"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315212/Trx 5eaf7277babf56525b6addc63433c4ac303fe1c8
View Raw JSON Data
{
  "trx_id": "5eaf7277babf56525b6addc63433c4ac303fe1c8",
  "block": 17315212,
  "trx_in_block": 20,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:14:33",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\",\"bitcoin\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:14:00
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315201/Trx e34a1787835677b24f533ffc57a1197c533698a9
View Raw JSON Data
{
  "trx_id": "e34a1787835677b24f533ffc57a1197c533698a9",
  "block": 17315201,
  "trx_in_block": 7,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:14:00",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:13:42
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315195/Trx 1c017471b08cfe84388e2794fe11fd7a2f4d99ae
View Raw JSON Data
{
  "trx_id": "1c017471b08cfe84388e2794fe11fd7a2f4d99ae",
  "block": 17315195,
  "trx_in_block": 4,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:13:42",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:13:09
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315184/Trx 8390955b7933dd5027320260247f69a79045da9c
View Raw JSON Data
{
  "trx_id": "8390955b7933dd5027320260247f69a79045da9c",
  "block": 17315184,
  "trx_in_block": 31,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:13:09",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:13:00
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315181/Trx bcab26ad09e92638fdc6059c0483fa6947dbb7f1
View Raw JSON Data
{
  "trx_id": "bcab26ad09e92638fdc6059c0483fa6947dbb7f1",
  "block": 17315181,
  "trx_in_block": 22,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:13:00",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:12:27
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315170/Trx 2e8439c67c95842c3b567d3e8310ddc83035d6a6
View Raw JSON Data
{
  "trx_id": "2e8439c67c95842c3b567d3e8310ddc83035d6a6",
  "block": 17315170,
  "trx_in_block": 13,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:12:27",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:12:18
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315167/Trx 8cd9d5d889bd02df965795bdb232f4da49fdb90c
View Raw JSON Data
{
  "trx_id": "8cd9d5d889bd02df965795bdb232f4da49fdb90c",
  "block": 17315167,
  "trx_in_block": 14,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:12:18",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:12:09
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315164/Trx 8d769e72f60ce5e69c6e83625758628b7ab11f23
View Raw JSON Data
{
  "trx_id": "8d769e72f60ce5e69c6e83625758628b7ab11f23",
  "block": 17315164,
  "trx_in_block": 18,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:12:09",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:11:45
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315156/Trx 7c0aed8511538e6024b669f66c0dc68827c1c6a2
View Raw JSON Data
{
  "trx_id": "7c0aed8511538e6024b669f66c0dc68827c1c6a2",
  "block": 17315156,
  "trx_in_block": 11,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:11:45",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:11:39
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315154/Trx eed9d482a59ab67c10a71eb12c48866f86cb1b94
View Raw JSON Data
{
  "trx_id": "eed9d482a59ab67c10a71eb12c48866f86cb1b94",
  "block": 17315154,
  "trx_in_block": 19,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:11:39",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:11:30
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315151/Trx 53881751709ae75cdc3d1bc749810f764f377ec6
View Raw JSON Data
{
  "trx_id": "53881751709ae75cdc3d1bc749810f764f377ec6",
  "block": 17315151,
  "trx_in_block": 19,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:11:30",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:10:57
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months.
json metadata{"tags":["blockchain","cryptocurrency","bitcoin","news","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315140/Trx 45d3b451fe157bc61ae638ef9b9b26559e2c9dd3
View Raw JSON Data
{
  "trx_id": "45d3b451fe157bc61ae638ef9b9b26559e2c9dd3",
  "block": 17315140,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:10:57",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"bitcoin\",\"news\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:09:54
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body@@ -5959,154 +5959,4 @@ ths. -%0A%0Aquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315119/Trx 020bc830cda5004efeadf9b7b081e228e665a539
View Raw JSON Data
{
  "trx_id": "020bc830cda5004efeadf9b7b081e228e665a539",
  "block": 17315119,
  "trx_in_block": 17,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:09:54",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "@@ -5959,154 +5959,4 @@\n ths.\n-%0A%0Aquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\n",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:09:36
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315113/Trx 874d99ac2878d00c2e5f1fe0130e0a6aaa44a83e
View Raw JSON Data
{
  "trx_id": "874d99ac2878d00c2e5f1fe0130e0a6aaa44a83e",
  "block": 17315113,
  "trx_in_block": 10,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:09:36",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:04:33
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency","powerledger","news","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315012/Trx 3f75b71b8cdba10b26f0bdfaecd32ea1fe2955d8
View Raw JSON Data
{
  "trx_id": "3f75b71b8cdba10b26f0bdfaecd32ea1fe2955d8",
  "block": 17315012,
  "trx_in_block": 9,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:04:33",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"powerledger\",\"news\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:04:03
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency","powerledger","news","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17315002/Trx f500dd35c05f6bf7cc4f6ce201bfa6cfc13b35a5
View Raw JSON Data
{
  "trx_id": "f500dd35c05f6bf7cc4f6ce201bfa6cfc13b35a5",
  "block": 17315002,
  "trx_in_block": 27,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:04:03",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"powerledger\",\"news\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:03:09
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency","powerledger","news","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17314984/Trx 30a4fd3db7e8ea5f771d1b548b24aeb43461282f
View Raw JSON Data
{
  "trx_id": "30a4fd3db7e8ea5f771d1b548b24aeb43461282f",
  "block": 17314984,
  "trx_in_block": 15,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:03:09",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"powerledger\",\"news\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/18 00:00:21
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency","powerledger","news","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17314928/Trx 673b752332e08746dd3f536593ddb119858d23b0
View Raw JSON Data
{
  "trx_id": "673b752332e08746dd3f536593ddb119858d23b0",
  "block": 17314928,
  "trx_in_block": 25,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-18T00:00:21",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"powerledger\",\"news\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/17 23:58:57
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency","powerledger","news","technology"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17314900/Trx 1d2b189c90062a3bdada1f06af1bac3982cefe3f
View Raw JSON Data
{
  "trx_id": "1d2b189c90062a3bdada1f06af1bac3982cefe3f",
  "block": 17314900,
  "trx_in_block": 10,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T23:58:57",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"powerledger\",\"news\",\"technology\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/17 23:56:09
votercgrffs
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
weight10000 (100.00%)
Transaction InfoBlock #17314844/Trx 1a628b5962018da302bcd38ce82182c1b897588c
View Raw JSON Data
{
  "trx_id": "1a628b5962018da302bcd38ce82182c1b897588c",
  "block": 17314844,
  "trx_in_block": 17,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T23:56:09",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "weight": 10000
    }
  ]
}
2017/11/17 23:52:33
parent authorcgrffs
parent permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
authorcheetah
permlinkcheetah-re-cgrffsaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
title
bodyHi! I am a robot. I just upvoted you! I found similar content that readers might be interested in: https://paymentweek.com/2017-11-17-australian-government-awards-grant-8-million-project-using-blockchain-technology-integrate-distributed-energy-water-systems/
json metadata
Transaction InfoBlock #17314772/Trx 11fa45653cf80f96ae65ecdeb15c2728caede76f
View Raw JSON Data
{
  "trx_id": "11fa45653cf80f96ae65ecdeb15c2728caede76f",
  "block": 17314772,
  "trx_in_block": 3,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T23:52:33",
  "op": [
    "comment",
    {
      "parent_author": "cgrffs",
      "parent_permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "author": "cheetah",
      "permlink": "cheetah-re-cgrffsaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "",
      "body": "Hi! I am a robot. I just upvoted you! I found similar content that readers might be interested in:\nhttps://paymentweek.com/2017-11-17-australian-government-awards-grant-8-million-project-using-blockchain-technology-integrate-distributed-energy-water-systems/",
      "json_metadata": ""
    }
  ]
}
2017/11/17 23:52:27
votercheetah
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
weight50 (0.50%)
Transaction InfoBlock #17314770/Trx d9dc9b6540adfe4251b9b00769e23be5ec3ffe3a
View Raw JSON Data
{
  "trx_id": "d9dc9b6540adfe4251b9b00769e23be5ec3ffe3a",
  "block": 17314770,
  "trx_in_block": 13,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T23:52:27",
  "op": [
    "vote",
    {
      "voter": "cheetah",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "weight": 50
    }
  ]
}
2017/11/17 23:52:00
parent author
parent permlinkblockchain
authorcgrffs
permlinkaustralian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform
titleAustralian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform
body![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg) Today the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger. The project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project. What Are The Funds For? The project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living. How Will It Work? The trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities. ![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png) Onsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector. Brad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.” What Role Will The Partners Play? ![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png) Curtin University has responsibility for project management duties and will carry out the research underpinning the project. Professor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.” Murdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid. Martin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform. “I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.” Curtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects. Professor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.” CISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth. CSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling. “CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems. Landcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology. Dean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.” How Is Power Ledger Involved? Power Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery. Dr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.” The project will span over two years and will commence within the next two months. quote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae
json metadata{"tags":["blockchain","cryptocurrency","powerledger"],"image":["https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg","https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png","https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png"],"links":["https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17314761/Trx 1709c8a72ee68f0c552b2131bc7906f7dc754b2d
View Raw JSON Data
{
  "trx_id": "1709c8a72ee68f0c552b2131bc7906f7dc754b2d",
  "block": 17314761,
  "trx_in_block": 21,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T23:52:00",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "australian-government-awards-grant-to-usd8-million-project-in-the-city-of-fremantle-using-the-power-ledger-platform",
      "title": "Australian Government Awards Grant to $8 Million Project In The City Of Fremantle Using The Power Ledger Platform",
      "body": "![1_n73sAnE9P8BJJ7M_QdJ19w.jpeg](https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg)\nToday the Australian government announced they will provide $2.57 million in funding for a cutting edge project in the City of Fremantle and $5.68 million will be funded through project partners including Curtin University, Murdoch University, Curtin Institute of Computation, LandCorp, CSIRO/Data61, CISCO and Power Ledger.\n\nThe project is trialling the use of blockchain-powered distributed energy and water systems and was the second largest recipient of the Grant across all of Australia, following behind the ‘Switching on Darwin’ project.\n\nWhat Are The Funds For?\nThe project, which involves academic, infrastructure and technology partners, will assess how cities can use blockchain technology and data analytics to integrate distributed energy and water systems. The federal funding comes as part of the government’s inaugural Smart Cities and Suburbs Program which aims to solve practical problems. The project will also be supported by the Australian Energy Market Operator (AEMO), Western Power, and the CRC for Low Carbon Living.\n\nHow Will It Work?\nThe trial will involve highly resilient, low-carbon and low-cost systems installed and connected using blockchain technology. A large solar photovoltaic (PV) plant, rooftop solar PV panels, a precinct sized battery, an electric vehicle charge station and precinct water treatment and capture systems will be orchestrated using blockchain technology and data analytics, and demonstrate the interconnected infrastructure of future smart cities.\n\n![power.png](https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png)\n\nOnsite energy generation at water treatment systems will also circumvent the need for costly distribution overhauls, as they are due for a $3million upgrade to increase capacity. The project will provide the community with financial and service sustainability while still engaging the private sector.\nBrad Pettitt, Mayor of the City of Fremantle, said: “We are delighted to host this project in the City of Fremantle. This collaboration between existing infrastructure, renewable energy and innovative technology fits with our One Planet zero carbon energy target and will help us to secure the ongoing sustainability of essential services for communities that live here.”\nWhat Role Will The Partners Play?\n![ledger.png](https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png)\n\nCurtin University has responsibility for project management duties and will carry out the research underpinning the project.\n\nProfessor Greg Morrison of Curtin University said: “We will develop a smart metering, battery storage and blockchain trading system to allow energy and water efficiencies between critical dispersed infrastructures that would otherwise have required physical co-location.”\n\nMurdoch University will provide research support on alternative district water supply and storage schemes that will be used to provide water, capacity and ancillary services to each other and the grid.\n\nMartin Anda, Academic Chair of Environmental Engineering, said: “This news is very exciting as we now have the opportunity to develop an entirely new precinct scale urban water system in Fremantle that will harmonise with the innovative Power Ledger Platform.\n\n“I am thrilled with the prospect of commencing research, modelling and designing the novel water distribution infrastructure upgrades at Knutsford, through rainwater capture and wastewater recycling, with the City of Fremantle and the whole team.”\n\nCurtin Institute for Computation and Data61 will provide the data analytics required to generate insights from these projects.\n\nProfessor Andrew Rohl, Director of the Curtin Institute for Computation, said: “We commend the City of Fremantle and its industry partners for their vision on this project and look forward to assisting them to provide a more sustainable future for their community.”\n\nCISCO will be supporting the project as part of its strategic partnership with Curtin University called Innovation Central Perth.\n\nCSIRO and Data61 have the capabilities required to assist in the delivery of this project, including megatrend analysis, risk analysis, statistical forecasting and systems modelling.\n\n“CSIRO’s experience collaborating with industry and government to build platforms will ensure the data generated by the project will be utilised by the community, project partners and municipal government.” said Glenn Platt, the Research Director of Grids & Energy Efficiency Systems.\n\nLandcorp is taking part in the project to monitor success in order to explore alternative water and energy systems that are connected to smart technology.\n\nDean Mudford, Chief Operations Officer of Landcorp, said: “We are excited to be part of a shared commitment to explore alternative water and energy systems which are innovative, resource efficient and connected to smart technology. The potential for this level of innovation to be embedded within the next stage of our Knutsford development supports our broader corporate objective to lead by doing. Funding which allows research to explore alternative water and energy systems has the potential to significantly reduce infrastructure development costs for decades to come.”\n\nHow Is Power Ledger Involved?\nPower Ledger will provide the transactional layer for the renewable assets as well as the ownership model for the community owned battery.\n\nDr. Jemma Green, co-founder and chairperson of Power Ledger, said: “ Power Ledger is excited to work with a consortium of innovators and technical experts to grow and develop the platform. We’re excited to break ground on this truly novel project that utilises blockchain technology to orchestrate sustainable assets.”\n\nThe project will span over two years and will commence within the next two months.\n\nquote: https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae",
      "json_metadata": "{\"tags\":[\"blockchain\",\"cryptocurrency\",\"powerledger\"],\"image\":[\"https://steemitimages.com/DQmQps8HjM9xdTJ9uJeuiH7PCp5ZoXM4SKugCDwhaCUy3W2/1_n73sAnE9P8BJJ7M_QdJ19w.jpeg\",\"https://steemitimages.com/DQmNcKcwrQdYRZ9GXS3k2AEnRvXd7yFyMyRhKWWFBieQaH3/power.png\",\"https://steemitimages.com/DQmY6ZkpMuyJXJ5XfNkPrvSc1wAMS7mze9EQbHLMK62KQZy/ledger.png\"],\"links\":[\"https://medium.com/power-ledger/australian-government-awards-grant-to-8-million-project-in-the-city-of-fremantle-using-the-power-2dbadfad50ae\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
cgrffsfollowed @sawdah
2017/11/17 20:05:33
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"sawdah","what":["blog"]}]
Transaction InfoBlock #17310233/Trx 7380f79ad34a282c26a0822cec48c7f882f93ae6
View Raw JSON Data
{
  "trx_id": "7380f79ad34a282c26a0822cec48c7f882f93ae6",
  "block": 17310233,
  "trx_in_block": 20,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T20:05:33",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"sawdah\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/17 19:57:51
votercgrffs
authorxwerk
permlinkbitcore-btx-guide-the-2nd-snapshot-for-btc-hodlers-free-btx-or-how-it-works
weight10000 (100.00%)
Transaction InfoBlock #17310079/Trx 9880bd1996ee71ffd6cf0bd341d03d9bd551914f
View Raw JSON Data
{
  "trx_id": "9880bd1996ee71ffd6cf0bd341d03d9bd551914f",
  "block": 17310079,
  "trx_in_block": 21,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T19:57:51",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "xwerk",
      "permlink": "bitcore-btx-guide-the-2nd-snapshot-for-btc-hodlers-free-btx-or-how-it-works",
      "weight": 10000
    }
  ]
}
2017/11/17 11:22:18
votermityusha
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
weight10000 (100.00%)
Transaction InfoBlock #17299769/Trx e2f318b336e9d0e592bbc2af6bed74c43987186e
View Raw JSON Data
{
  "trx_id": "e2f318b336e9d0e592bbc2af6bed74c43987186e",
  "block": 17299769,
  "trx_in_block": 30,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T11:22:18",
  "op": [
    "vote",
    {
      "voter": "mityusha",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "weight": 10000
    }
  ]
}
2017/11/17 11:21:18
voterlecheremn
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
weight10000 (100.00%)
Transaction InfoBlock #17299749/Trx f84daf0e1dca15b36737073239946d057a46d5b8
View Raw JSON Data
{
  "trx_id": "f84daf0e1dca15b36737073239946d057a46d5b8",
  "block": 17299749,
  "trx_in_block": 8,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T11:21:18",
  "op": [
    "vote",
    {
      "voter": "lecheremn",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "weight": 10000
    }
  ]
}
2017/11/17 08:41:42
votercgrffs
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
weight10000 (100.00%)
Transaction InfoBlock #17296557/Trx 3bc33c323ce2d935b689befc3e50381c0e8fcc30
View Raw JSON Data
{
  "trx_id": "3bc33c323ce2d935b689befc3e50381c0e8fcc30",
  "block": 17296557,
  "trx_in_block": 16,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T08:41:42",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "weight": 10000
    }
  ]
}
2017/11/17 08:40:54
parent author
parent permlinkblockchain
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
titleEXMR: New Era Monero (ERC20) With Ethereum Platform
bodyComposed of Ethereum infrastructure and another coin, Monero, eMonero is getting ready to meet its investors with the airdrop and bounty campaigns that are starting to take shape in the near future. eMonero is the abbreviation for the coin market “ EXMR “. With the Erc20 feature , it works perfectly with wallets like eMonero , Myetherwallet, ImToken and Mist. Only 15 million units of exmrand this amount is an extraordinary amount for a coin. One of the things that is known as a coin or a buck is that the gold mine is found in a similar way due to its acceptance in investment markets. What is rare in the coin market is becoming valuable. If you look at the price of Doge, which is 150 billion in the market, you will understand more easily what I mean. eMonero is a coin despite the fact that it uses ethereum infrastructure, so it offers the possibility to create smart contracts and creative applications. In a sense, another infrastructure is being created within the infrastructure. When we examine the emblem of eMoreno, you can see that it is composed of a combination of emblems of Ethereum and Monero such as name. Since eMonero , which is planned to be listed on various coin stock exchanges in recent period , is likely to be listed first in etherdelta as it uses the Ethereum infrastructure. If you are interested in eMonero, you can start by examining http://www.e-xmr.io , the official page of the project . You can follow the updates on the official twitter page ( https://twitter.com/eXMRCoin ). We also suggest that you check eMonero ‘s Bitcointalk official page if you want to earn a bit of exmr as a support for your project eMonero’s idea is as follows: Symbol: EXMR Address: 0xc98e0639c6d2ec037a615341c369666b110e80e5 Supply: 15,000,000 (8 Decimals) Following in the footsteps of success of eBTC and eLTC that have shown the great power of the ethereum platform in digital asset token systems. That’s what underlies Monero, making it tokenized with ERC20. EXMR a new breakthrough from Monero’s combined and ethereum creates a Token with the Ethhereum Platform and runs on a Ethereum blockchain system that has 3 advantages fiture: Monero as a token in Ethereum means compatibility with existing wallets like MyEtherWallet, Mist, imToken and more. With the advantages of smart ethereum contract token, eMonero enables us to create an innovative system or application using the token Solidity. The token is created for a limited 15,000,000 EXMR to ensure the token value remains high and will always be a fixed amount. This ensures consistent supply and no additional EXMR can be created. Token Monero (EXMR) is distributed for free with airdrop system to 5000 members who participate in this event in the form of Social media, Blog, Youtube and Bitcointalk because this Token power exists in the existing community, then with this airdrop system, the tokens will be spread new after it is entered on the designated exchanger. HOW TO JOIN IN AIRDROP Please visit the link below: Oficial Blog: https://medium.com/@eXMR Web: http://www.e-xmr.io/#contribute Bitcointalk: https://bitcointalk.org/index.php?topic=2264594.0
json metadata{"tags":["blockchain","exmr","monero","erc20","cryptocurrency"],"links":["http://www.e-xmr.io","https://twitter.com/eXMRCoin","https://medium.com/@eXMR","http://www.e-xmr.io/#contribute","https://bitcointalk.org/index.php?topic=2264594.0"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17296541/Trx d6252144eab0cdb0157f77033e0b8d81cc133bbe
View Raw JSON Data
{
  "trx_id": "d6252144eab0cdb0157f77033e0b8d81cc133bbe",
  "block": 17296541,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T08:40:54",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "title": "EXMR: New Era Monero (ERC20) With Ethereum Platform",
      "body": "Composed of Ethereum infrastructure and another coin, Monero, eMonero is getting ready to meet its investors with the airdrop and bounty campaigns that are starting to take shape in the near future. eMonero is the abbreviation for the coin market “ EXMR “. With the Erc20 feature , it works perfectly with wallets like eMonero , Myetherwallet, ImToken and Mist. Only 15 million units of exmrand this amount is an extraordinary amount for a coin. One of the things that is known as a coin or a buck is that the gold mine is found in a similar way due to its acceptance in investment markets. What is rare in the coin market is becoming valuable. If you look at the price of Doge, which is 150 billion in the market, you will understand more easily what I mean.\n\neMonero is a coin despite the fact that it uses ethereum infrastructure, so it offers the possibility to create smart contracts and creative applications. In a sense, another infrastructure is being created within the infrastructure. When we examine the emblem of eMoreno, you can see that it is composed of a combination of emblems of Ethereum and Monero such as name. Since eMonero , which is planned to be listed on various coin stock exchanges in recent period , is likely to be listed first in etherdelta as it uses the Ethereum infrastructure.\n\nIf you are interested in eMonero, you can start by examining http://www.e-xmr.io , the official page of the project . You can follow the updates on the official twitter page ( https://twitter.com/eXMRCoin ). We also suggest that you check eMonero ‘s Bitcointalk official page if you want to earn a bit of exmr as a support for your project\neMonero’s idea is as follows:\n\nSymbol: EXMR\n\nAddress: 0xc98e0639c6d2ec037a615341c369666b110e80e5\n\nSupply: 15,000,000 (8 Decimals)\n\nFollowing in the footsteps of success of eBTC and eLTC that have shown the great power of the ethereum platform in digital asset token systems. That’s what underlies Monero, making it tokenized with ERC20.\nEXMR a new breakthrough from Monero’s combined and ethereum creates a Token with the Ethhereum Platform and runs on a Ethereum blockchain system that has 3 advantages fiture:\nMonero as a token in Ethereum means compatibility with existing wallets like MyEtherWallet, Mist, imToken and more.\nWith the advantages of smart ethereum contract token, eMonero enables us to create an innovative system or application using the token Solidity.\nThe token is created for a limited 15,000,000 EXMR to ensure the token value remains high and will always be a fixed amount. This ensures consistent supply and no additional EXMR can be created.\nToken Monero (EXMR) is distributed for free with airdrop system to 5000 members who participate in this event in the form of Social media, Blog, Youtube and Bitcointalk because this Token power exists in the existing community, then with this airdrop system, the tokens will be spread new after it is entered on the designated exchanger.\n\nHOW TO JOIN IN AIRDROP\n\nPlease visit the link below:\n\nOficial Blog: https://medium.com/@eXMR\nWeb: http://www.e-xmr.io/#contribute\nBitcointalk: https://bitcointalk.org/index.php?topic=2264594.0",
      "json_metadata": "{\"tags\":[\"blockchain\",\"exmr\",\"monero\",\"erc20\",\"cryptocurrency\"],\"links\":[\"http://www.e-xmr.io\",\"https://twitter.com/eXMRCoin\",\"https://medium.com/@eXMR\",\"http://www.e-xmr.io/#contribute\",\"https://bitcointalk.org/index.php?topic=2264594.0\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/17 08:36:45
parent author
parent permlinkblockchain
authorcgrffs
permlinkexmr-new-era-monero-erc20-with-ethereum-platform
titleEXMR: New Era Monero (ERC20) With Ethereum Platform
bodyComposed of Ethereum infrastructure and another coin, Monero, eMonero is getting ready to meet its investors with the airdrop and bounty campaigns that are starting to take shape in the near future. eMonero is the abbreviation for the coin market “ EXMR “. With the Erc20 feature , it works perfectly with wallets like eMonero , Myetherwallet, ImToken and Mist. Only 15 million units of exmrand this amount is an extraordinary amount for a coin. One of the things that is known as a coin or a buck is that the gold mine is found in a similar way due to its acceptance in investment markets. What is rare in the coin market is becoming valuable. If you look at the price of Doge, which is 150 billion in the market, you will understand more easily what I mean. eMonero is a coin despite the fact that it uses ethereum infrastructure, so it offers the possibility to create smart contracts and creative applications. In a sense, another infrastructure is being created within the infrastructure. When we examine the emblem of eMoreno, you can see that it is composed of a combination of emblems of Ethereum and Monero such as name. Since eMonero , which is planned to be listed on various coin stock exchanges in recent period , is likely to be listed first in etherdelta as it uses the Ethereum infrastructure. If you are interested in eMonero, you can start by examining http://www.e-xmr.io , the official page of the project . You can follow the updates on the official twitter page ( https://twitter.com/eXMRCoin ). We also suggest that you check eMonero ‘s Bitcointalk official page if you want to earn a bit of exmr as a support for your project eMonero’s idea is as follows: Symbol: EXMR Address: 0xc98e0639c6d2ec037a615341c369666b110e80e5 Supply: 15,000,000 (8 Decimals) Following in the footsteps of success of eBTC and eLTC that have shown the great power of the ethereum platform in digital asset token systems. That’s what underlies Monero, making it tokenized with ERC20. EXMR a new breakthrough from Monero’s combined and ethereum creates a Token with the Ethhereum Platform and runs on a Ethereum blockchain system that has 3 advantages fiture: Monero as a token in Ethereum means compatibility with existing wallets like MyEtherWallet, Mist, imToken and more. With the advantages of smart ethereum contract token, eMonero enables us to create an innovative system or application using the token Solidity. The token is created for a limited 15,000,000 EXMR to ensure the token value remains high and will always be a fixed amount. This ensures consistent supply and no additional EXMR can be created. Token Monero (EXMR) is distributed for free with airdrop system to 5000 members who participate in this event in the form of Social media, Blog, Youtube and Bitcointalk because this Token power exists in the existing community, then with this airdrop system, the tokens will be spread new after it is entered on the designated exchanger. HOW TO JOIN IN AIRDROP Please visit the link below: Oficial Blog: https://medium.com/@eXMR Web: http://www.e-xmr.io/#contribute Bitcointalk: https://bitcointalk.org/index.php?topic=2264594.0
json metadata{"tags":["blockchain","exmr","monero","erc20"],"links":["http://www.e-xmr.io","https://twitter.com/eXMRCoin","https://medium.com/@eXMR","http://www.e-xmr.io/#contribute","https://bitcointalk.org/index.php?topic=2264594.0"],"app":"steemit/0.1","format":"markdown"}
Transaction InfoBlock #17296458/Trx 29c336da2db0fe4254dfccaa2b5012f438265cc3
View Raw JSON Data
{
  "trx_id": "29c336da2db0fe4254dfccaa2b5012f438265cc3",
  "block": 17296458,
  "trx_in_block": 14,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T08:36:45",
  "op": [
    "comment",
    {
      "parent_author": "",
      "parent_permlink": "blockchain",
      "author": "cgrffs",
      "permlink": "exmr-new-era-monero-erc20-with-ethereum-platform",
      "title": "EXMR: New Era Monero (ERC20) With Ethereum Platform",
      "body": "Composed of Ethereum infrastructure and another coin, Monero, eMonero is getting ready to meet its investors with the airdrop and bounty campaigns that are starting to take shape in the near future. eMonero is the abbreviation for the coin market “ EXMR “. With the Erc20 feature , it works perfectly with wallets like eMonero , Myetherwallet, ImToken and Mist. Only 15 million units of exmrand this amount is an extraordinary amount for a coin. One of the things that is known as a coin or a buck is that the gold mine is found in a similar way due to its acceptance in investment markets. What is rare in the coin market is becoming valuable. If you look at the price of Doge, which is 150 billion in the market, you will understand more easily what I mean.\n\neMonero is a coin despite the fact that it uses ethereum infrastructure, so it offers the possibility to create smart contracts and creative applications. In a sense, another infrastructure is being created within the infrastructure. When we examine the emblem of eMoreno, you can see that it is composed of a combination of emblems of Ethereum and Monero such as name. Since eMonero , which is planned to be listed on various coin stock exchanges in recent period , is likely to be listed first in etherdelta as it uses the Ethereum infrastructure.\n\nIf you are interested in eMonero, you can start by examining http://www.e-xmr.io , the official page of the project . You can follow the updates on the official twitter page ( https://twitter.com/eXMRCoin ). We also suggest that you check eMonero ‘s Bitcointalk official page if you want to earn a bit of exmr as a support for your project\neMonero’s idea is as follows:\n\nSymbol: EXMR\n\nAddress: 0xc98e0639c6d2ec037a615341c369666b110e80e5\n\nSupply: 15,000,000 (8 Decimals)\n\nFollowing in the footsteps of success of eBTC and eLTC that have shown the great power of the ethereum platform in digital asset token systems. That’s what underlies Monero, making it tokenized with ERC20.\nEXMR a new breakthrough from Monero’s combined and ethereum creates a Token with the Ethhereum Platform and runs on a Ethereum blockchain system that has 3 advantages fiture:\nMonero as a token in Ethereum means compatibility with existing wallets like MyEtherWallet, Mist, imToken and more.\nWith the advantages of smart ethereum contract token, eMonero enables us to create an innovative system or application using the token Solidity.\nThe token is created for a limited 15,000,000 EXMR to ensure the token value remains high and will always be a fixed amount. This ensures consistent supply and no additional EXMR can be created.\nToken Monero (EXMR) is distributed for free with airdrop system to 5000 members who participate in this event in the form of Social media, Blog, Youtube and Bitcointalk because this Token power exists in the existing community, then with this airdrop system, the tokens will be spread new after it is entered on the designated exchanger.\n\nHOW TO JOIN IN AIRDROP\n\nPlease visit the link below:\n\nOficial Blog: https://medium.com/@eXMR\nWeb: http://www.e-xmr.io/#contribute\nBitcointalk: https://bitcointalk.org/index.php?topic=2264594.0",
      "json_metadata": "{\"tags\":[\"blockchain\",\"exmr\",\"monero\",\"erc20\"],\"links\":[\"http://www.e-xmr.io\",\"https://twitter.com/eXMRCoin\",\"https://medium.com/@eXMR\",\"http://www.e-xmr.io/#contribute\",\"https://bitcointalk.org/index.php?topic=2264594.0\"],\"app\":\"steemit/0.1\",\"format\":\"markdown\"}"
    }
  ]
}
2017/11/17 07:16:54
votercgrffs
authorkingscrown
permlinkbitcoin-went-to-8000usd-which-alts-stayed-alive
weight10000 (100.00%)
Transaction InfoBlock #17294862/Trx 8396aa12f44b77f8a14fb950985c08a323875629
View Raw JSON Data
{
  "trx_id": "8396aa12f44b77f8a14fb950985c08a323875629",
  "block": 17294862,
  "trx_in_block": 10,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T07:16:54",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "kingscrown",
      "permlink": "bitcoin-went-to-8000usd-which-alts-stayed-alive",
      "weight": 10000
    }
  ]
}
2017/11/17 07:16:42
votercgrffs
authorkingscrown
permlinkhacken-decentralized-bug-bounty-marketplace-for-white-hat-hackers
weight10000 (100.00%)
Transaction InfoBlock #17294858/Trx 12df663c30167d0fa3510132c972bc7734e2b346
View Raw JSON Data
{
  "trx_id": "12df663c30167d0fa3510132c972bc7734e2b346",
  "block": 17294858,
  "trx_in_block": 8,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-17T07:16:42",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "kingscrown",
      "permlink": "hacken-decentralized-bug-bounty-marketplace-for-white-hat-hackers",
      "weight": 10000
    }
  ]
}
2017/11/16 12:25:45
votercgrffs
authorkingscrown
permlinkbitcoin-in-zimwabwe-hits-13-000-usd
weight10000 (100.00%)
Transaction InfoBlock #17272245/Trx ee0c9ec2a93683fb8aa51c317f3e3fbd4d13295b
View Raw JSON Data
{
  "trx_id": "ee0c9ec2a93683fb8aa51c317f3e3fbd4d13295b",
  "block": 17272245,
  "trx_in_block": 0,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-16T12:25:45",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "kingscrown",
      "permlink": "bitcoin-in-zimwabwe-hits-13-000-usd",
      "weight": 10000
    }
  ]
}
2017/11/16 12:25:21
votercgrffs
authora-a-a
permlinkwatch-the-coming-apocalypse-and-it-s-supernatural-show-here
weight10000 (100.00%)
Transaction InfoBlock #17272237/Trx c939c7ac83d1f3a76f1f1ea9bd7e6016a3c4353d
View Raw JSON Data
{
  "trx_id": "c939c7ac83d1f3a76f1f1ea9bd7e6016a3c4353d",
  "block": 17272237,
  "trx_in_block": 16,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-16T12:25:21",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "a-a-a",
      "permlink": "watch-the-coming-apocalypse-and-it-s-supernatural-show-here",
      "weight": 10000
    }
  ]
}
2017/11/16 12:25:09
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"sportic","what":["blog"]}]
Transaction InfoBlock #17272233/Trx 264268cec348a412694a7329029825230de76b49
View Raw JSON Data
{
  "trx_id": "264268cec348a412694a7329029825230de76b49",
  "block": 17272233,
  "trx_in_block": 10,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-16T12:25:09",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"sportic\",\"what\":[\"blog\"]}]"
    }
  ]
}
cgrffsfollowed @a-a-a
2017/11/15 21:51:57
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"a-a-a","what":["blog"]}]
Transaction InfoBlock #17254771/Trx 3bc01877322313df313dfba70098b79bf06087c4
View Raw JSON Data
{
  "trx_id": "3bc01877322313df313dfba70098b79bf06087c4",
  "block": 17254771,
  "trx_in_block": 9,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-15T21:51:57",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"a-a-a\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/15 21:51:54
required auths[]
required posting auths["cgrffs"]
idfollow
json["follow",{"follower":"cgrffs","following":"rakib002","what":["blog"]}]
Transaction InfoBlock #17254770/Trx ea16eb4700b42b02f419ce252918ac134158f7a4
View Raw JSON Data
{
  "trx_id": "ea16eb4700b42b02f419ce252918ac134158f7a4",
  "block": 17254770,
  "trx_in_block": 12,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-15T21:51:54",
  "op": [
    "custom_json",
    {
      "required_auths": [],
      "required_posting_auths": [
        "cgrffs"
      ],
      "id": "follow",
      "json": "[\"follow\",{\"follower\":\"cgrffs\",\"following\":\"rakib002\",\"what\":[\"blog\"]}]"
    }
  ]
}
2017/11/15 21:51:45
votercgrffs
authorkingscrown
permlinkforks-to-be-new-icos-and-china-bans-mining-crypto
weight10000 (100.00%)
Transaction InfoBlock #17254767/Trx 91ccda70e68327495e3e8ac5ab36b2c2d8fca7ea
View Raw JSON Data
{
  "trx_id": "91ccda70e68327495e3e8ac5ab36b2c2d8fca7ea",
  "block": 17254767,
  "trx_in_block": 2,
  "op_in_trx": 0,
  "virtual_op": 0,
  "timestamp": "2017-11-15T21:51:45",
  "op": [
    "vote",
    {
      "voter": "cgrffs",
      "author": "kingscrown",
      "permlink": "forks-to-be-new-icos-and-china-bans-mining-crypto",
      "weight": 10000
    }
  ]
}

Account Metadata

POSTING JSON METADATA
None
JSON METADATA
None
{
  "posting_json_metadata": {},
  "json_metadata": {}
}

Auth Keys

Owner
Single Signature
Public Keys
STM5HDzmK1h9CZicqDZT9Jr2V7KBruKAPttg2TwkNJbnKtJvyLQcR1/1
Active
Single Signature
Public Keys
STM66V72BGRU78TwTteupDjDfkRs9gHt9D4vFuR5LWej1MiiCBoMp1/1
Posting
Single Signature
Public Keys
STM6LMW2feM8Ka2itNbrARGrTjaaE9HH9NmJzPQE94binakSccyZ61/1
Memo
STM5bEzxwAYKPdPvfXqgrX6VUeyov69CyH1NAsZKQzAmyrFLvjQsN
{
  "owner": {
    "weight_threshold": 1,
    "account_auths": [],
    "key_auths": [
      [
        "STM5HDzmK1h9CZicqDZT9Jr2V7KBruKAPttg2TwkNJbnKtJvyLQcR",
        1
      ]
    ]
  },
  "active": {
    "weight_threshold": 1,
    "account_auths": [],
    "key_auths": [
      [
        "STM66V72BGRU78TwTteupDjDfkRs9gHt9D4vFuR5LWej1MiiCBoMp",
        1
      ]
    ]
  },
  "posting": {
    "weight_threshold": 1,
    "account_auths": [],
    "key_auths": [
      [
        "STM6LMW2feM8Ka2itNbrARGrTjaaE9HH9NmJzPQE94binakSccyZ6",
        1
      ]
    ]
  },
  "memo": "STM5bEzxwAYKPdPvfXqgrX6VUeyov69CyH1NAsZKQzAmyrFLvjQsN"
}

Witness Votes

0 / 30
No active witness votes.
[]